Loading Arm INSPECTION AND TESTING
The factory tests shall be demonstrate the following:
• Specification compliance checks.
• Complete hydraulic power system;
• Control and alarm systems;
• Operating times of the QC/DC;
• Safe operating of the loading arm;
• Operation of the various interlock;
• Operation of the control panel and the pendant;
• Operating envelope at jetty level;

评论
发表评论