QRH Mooring Load Monitoring system(MLMS)

图片
Glen hooks provide load read out with continuous remote load recording, This allows the shore facility to warn the vessel crew when high mooring line loads are being experienced. It design to provide continuous, automatic monitoring and recording of the mooring line loads applied at each hook. The system shall include all equipment, power and control cables, amplfiers, junction boxes, power supplies, electronic data processing equipment etc. As required to monitor the line loads and transmit the data back to the Shore Control Centre. GLEN MLMS accuracy and safety   ► Load Measuring Pins   Each mooring hook equip with load measuring pin installed into the hook at the place of horizontal hook pin. Each load measuring pin calibrated up to the proof load during the hook load-test.  Load measuring pins have the minimum specifications Criteria Design value Proof Load Min150% of hook safe working load Accuracy +/-2% of the full load IP rating IP6...

QRH Remote Control Release System

图片
in case of an emergency, Operator have to do hook release from a distance, such as the jetty control room. So, in addition to the standard manual release, the mooring hooks can be equipped with a remote release system. RCRS running convenient and simple ► Each individual   mooring hook can be released by RCRS ► Hook Position sensor   show the hook status(open/closed) at the remote control panel or central computer system ► Local release on control box   Glen mooring hook have local electrical release functionality of the mooring hooks at the mooring hook location ► Central computer system   All RCRS controls and information show on a Remote Control Panel on the central computer system located in the Shore Control Centre and running Integrted Mooring System software. ► Remote Control Panel   the panel located into a non-hazardous control room and provided with: l  Mimic schematic of the jetty lay-out; l  Individual signalization status...

Hook Capstan

图片
Glen capstan equipped with rope guides to assist in leading to the messenger lines to the capstan head. It can greatly reduce the handling time of the linesmen needed for mooring. They prevent heavy lifting of mooring lines. Specifications Criteria  Design value Starting pull 30kN Running Pull 15kN Drum speed 25rpm Line Speed 0.4m/s How to ensure capstan running efficient , simple operation and safety ► Local Starter Motor  Each capstan executed with local reversible   &   space-heater motor-starter ► Ingress Protection  IP 65 protected for electric motors,   motor-starters and foot witches ► Insulation :The complete capstan and motor-starter have electrically insulated from the mooring units ► Certification  All electrical equipment ATEX certified for use in Zone 1 Hazardous Areas ► Maintenance free   Lubricated for life

Loading Arm Selection Guide

Table 1.  Arm  data basic Berth No. Type Arm Diameter Cargo Pipe Material Working pressure (MPa.) Design pressure (MPa.) Temperature ( ℃ ) Operation On-shore   flange   type On-ship   flange   type Table 2. Equipped Equipped Option ( √ ) Vacuum   breaker Drain   connect On-ship        □ On   shore      □ Purge   system Safety   ladders Adjustable   support   jack QC/DC(Quick   connect/Disconnect   coupler Manual          □ Hydraulic       □ Insulation   flange Range   limited   monitoring   System Electrical-Hydraulic   drive   system Hydraulic   Emergency   release   coupler ( ERC ) Electrical...