Glen supply quick release hook
Capstan
Glen capstan equipped with rope guides to assist in leading to the messenger lines to the capstan head. It can greatly reduce the handling time of the linesmen needed for mooring. They prevent heavy lifting of mooring lines.
Remote control release system
In case of an emergency, Operator have to do hook release from a distance, such as the jetty control room. So, in addition to the standard manual release, the mooring hooks can be equipped with a remote release system.
Mooring Load Monitoring system(MLMS)
Glen hooks provide load read out with continuous remote load recording, This allows the shore facility to warn the vessel crew when high mooring line loads are being experienced. It design to provide continuous, automatic monitoring and recording of the mooring line loads applied at each hook. The system shall include all equipment, power and control cables, amplfiers, junction boxes, power supplies, electronic data processing equipment etc. As required to monitor the line loads and transmit the data back to the Shore Control Centre.
Berthing Approach System
The Berthing Approach System (BAS) is used for safe berthing of vessels by measuring the distance, speed and angle of the ship’s bow and stern section in relation to the berth fenders and triggers alarms during the final sideways berthing phase.
The BAS comprise the systems to determine a vessels bow and stern approach velocity and display this information on an LED Display, handheld pagers and within the Shore Control Centre.
Environmental Monitoring system(EMS)
The Environmental Monitoring System (EMS) is used for measurement of several environmental data.
Central Monitoring System(CMS)
We will provide a PC running an Integrated Mooring System software package. The RCRS, MLMS, BAS & EMS systems will be modular components within the IMS.
Installation &Commissioning and Documents
Glen prepare comprehensive shipping, handing, storage and installation procedures and responsible for installation and commissioning of the Mooring System.
Glen capstan equipped with rope guides to assist in leading to the messenger lines to the capstan head. It can greatly reduce the handling time of the linesmen needed for mooring. They prevent heavy lifting of mooring lines.
Remote control release system
In case of an emergency, Operator have to do hook release from a distance, such as the jetty control room. So, in addition to the standard manual release, the mooring hooks can be equipped with a remote release system.
Mooring Load Monitoring system(MLMS)
Glen hooks provide load read out with continuous remote load recording, This allows the shore facility to warn the vessel crew when high mooring line loads are being experienced. It design to provide continuous, automatic monitoring and recording of the mooring line loads applied at each hook. The system shall include all equipment, power and control cables, amplfiers, junction boxes, power supplies, electronic data processing equipment etc. As required to monitor the line loads and transmit the data back to the Shore Control Centre.
Berthing Approach System
The Berthing Approach System (BAS) is used for safe berthing of vessels by measuring the distance, speed and angle of the ship’s bow and stern section in relation to the berth fenders and triggers alarms during the final sideways berthing phase.
The BAS comprise the systems to determine a vessels bow and stern approach velocity and display this information on an LED Display, handheld pagers and within the Shore Control Centre.
Environmental Monitoring system(EMS)
The Environmental Monitoring System (EMS) is used for measurement of several environmental data.
Central Monitoring System(CMS)
We will provide a PC running an Integrated Mooring System software package. The RCRS, MLMS, BAS & EMS systems will be modular components within the IMS.
Installation &Commissioning and Documents
Glen prepare comprehensive shipping, handing, storage and installation procedures and responsible for installation and commissioning of the Mooring System.