Central Monitoring System(CMS)
We will provide a PC running an Integrated Mooring System software package. The RCRS, MLMS, BAS & EMS systems will be modular components within the IMS.
The central computer system is located in the Shore Control Centre and consist of the following components:
· • PC with MS Windows operating system including
· all necessary hardware to operate the integrated
· mooring system
· • IMS software installed
· • 24” Flat Screen Monitor ( resolution 1920 x 1200 pixels )
· • Standard Keyboard (US) and Mouse
·
The IMS software include the following functionality as a minimum and dependent on the inclusion of the BAS and EMS within the scope of works:
· • On screen real time ship approach;
· • Facility to save berth approach coordinates for future replay;
· • Display approach data as a V-s curve ( velocity as a function of the distance );
· • Numerical display of distance for bow and stern;
· • Numerical display of bow and stern speed;
· • Warning-and alarm-levels for approach speed and angle of approach;
· • Graph showing the relative displacements (drift-off from Fenders and Fenders deflection);
· • Graphic mooring schedules showing the ships actual mooring plan;
· • Warning- and alarm-levels for slack-line, high line load limits and high hook load limits;
· • Facility to save all ship specific settings ( alarm-levels and mooring schedules) within a ship database;
· • Actual hook loads displayed both numeric as in dynamic bar graphs;
· • Graphic and textual presentation of hook status;
· • On screen release of one or a pre-selected group of hooks, emergency release in a pre-definable sequence;
· • Hook status history with a [ms] stamped timestamp for all changes in hook-status;
· • Numeric and graphic display of environmental data on the EMS screen;
· • Direction of wind and current are displayed in a wind rose relative to the real north on the jetty; and
· • Tidal data logged in a trend.
评论
发表评论